Three ways in, compared
On Keikyu's weekday planner, Terminal 3 to Shibuya takes about 38 minutes and costs ¥540 on a paper ticket or ¥536 by IC card: Keikyu as far as Shinagawa and 13 minutes on the clockwise Yamanote. The airport bus to Shibuya Station (Mark City) costs ¥1,300 and runs about 22 times a day, needing 45 to 60 minutes. A taxi on the Tokyo flat fare costs ¥8,500 by day plus expressway tolls. Shibuya is where a group of three or four should look hard at the taxi.
Following the clockwise Yamanote
Leave the Keikyu train at Shinagawa and walk through the Keikyu-JR transfer gates. The Yamanote platforms are signed in English; you want the clockwise direction towards Osaki, Gotanda and Shibuya. Shibuya Station has many exits, so find the one nearest your hotel on the station signs before climbing to the street. From Terminal 1 and 2 the same trip is about 43 minutes. On the planner, 23:51 is the final Terminal 3 train with a Shibuya connection, arriving 00:33.
Mark City drop-off and the hotel stops
Look for stop 4 at Terminal 3; the same buses then call at stop 10 in Terminal 2 and stop 9 in Terminal 1. The route is shared by Keikyu Bus, Tokyu Bus and Airport Limousine, all at the same ¥1,300 fare, and tickets are bought on the day at the airport machines or Terminal 3 counter, not timed in advance. It calls at Shibuya Station, then the Cerulean Tower Tokyu Hotel and the Shibuya Excel Hotel Tokyu at Mark City, which sits over the station. On the late-November timetable the first bus leaves at 05:45 and the last Terminal 3 departure is 22:35, reaching Shibuya at 23:24. Gaps vary from 25 minutes to over an hour, so check the time before you queue.
When the rank beats the bus
The flat fare to Shibuya ward is ¥8,500 by day and ¥10,000 between 22:00 and 05:00 on the ward chart issued for 20 April 2026. Tolls on the Shuto Expressway are added. Three bus fares already come to almost half the day taxi fare, so for a group the taxi costs only a little more and runs at any hour. At Terminal 3 the rank is stop 21 downstairs; give the hotel name; no reservation is required for the flat fare. Booking sites estimate about 30 minutes in light traffic.
Booked cars to Shibuya
Suntransfers advertises Haneda to Shibuya from €104.07 per car. The one thing it adds over the rank is a fixed meeting point in arrivals and a driver who already has the hotel address, which helps if you land after a long delay and do not want to explain a side-street location in Japanese.
Later than the last bus
Once the 22:35 bus has gone, the train runs another hour; after 23:51 there is no rail link that reaches Shibuya the same night. The late-night Limousine serves Shinjuku and Ikebukuro, not Shibuya, so after midnight a cab at ¥10,000 plus tolls is what remains.
Landing at Terminal 1 or 2 instead
Domestic arrivals and some international flights use Terminals 1 and 2, which share one Keikyu station at B1 below the terminals. The rail trip from there is about 43 minutes on the planner, five more than from Terminal 3, since every airport train starts at Terminal 3. The Shibuya bus picks up at Terminal 2 stop 10 roughly ten minutes after leaving Terminal 3, then at Terminal 1 stop 9 five minutes later, so on a busy departure the seats may already be partly taken. Haneda's own access page rounds the rail trip to Shibuya to about 45 minutes, a fair figure once you include the walk to the platform.
Notes for Shibuya arrivals
- If you land in the weekday morning rush, the bus spares you a packed Yamanote carriage with luggage.
- Paying by contactless bank card on Keikyu does not carry through the JR transfer gates at Shinagawa; an IC card does.
- If your hotel is in Ebisu or Daikanyama, also in Shibuya ward, the same flat taxi fare applies.